This report updates the production from Turangi and Turangi-McKee-Overthrust fields in PMP38161, onshore Taranaki. Current production wells are: Turangi-1, Turangi-2, Turangi-3, Turangi-4, Turangi-6, Urenui-1, Ohanga-1, Ohanga-2ST2 and Onaero-1R. Cumulative oil, gas and water production for each of the wells up to 30th June 2018 is presented. The total cumulative production from PMP38161 is 80.8Bscf gas, 3.7MMstb condensate and 1.0MMbbl water. In addition gas initially in-place (GIIP) is determined by material balance analysis and flowing material balance technique.