Permit38150TypePetroleumStart Date29 October 2012FormatsJPEG ZIPData TypeBorehole
-
Permit38049TypePetroleumStart Date25 August 1981FormatsTIF JPEG XLS ZIPData TypeBorehole
-
Permit38444TypePetroleumStart Date06 April 1992FormatsTIF ZIP JPEG XLSData TypeBorehole
-
Permit38002TypePetroleumStart Date29 November 1975FormatsTIF JPEG XLS ZIPData TypeBorehole
-
Permit381012TypePetroleumStart Date22 October 1992FormatsTIF PDF ZIP XLS 1 +Data TypeBorehole
-
PR4889
Mangahewa-9 Well Completion Report
The field development well, Mangahewa-09 is the fourth well to be drilled from the Mangahewa-C site within PMP38150, onshore Taranaki Basin. It was spudded on the 29th Oct 2012...Permit38150Start Date21 February 2013FormatsPDF ZIP JPEGData TypeReport -
PR4748
Soil Sampling survey for PEP 52819, Aparima
A limited soil sampling line was undertaken within PEP 52819, West Southland Basin. 11 points were sampled along the roadside where possible and sent to SYFT for C1-C6 testing....Permit52819Start Date28 July 2012FormatsPDF JPEG XLSXData TypeReport -
PR4691
Cheal-B7 Well Completion Report
Cheal-B7 is a deviated exploratory well designed to evaluate the hydrocarbon potential of an upper Miocene amplitude anomaly in PMP 38156. The primary target of this well was at...Permit38156Start Date13 January 2012FormatsPDF JPEG ZIPData TypeReport -
PR4689
Cheal C2 Well Completion Report
Cheal-C2 was drilled to evaluate the hydrocarbon potential of an upper Miocene amplitude anomaly in PMP 38156. The primary target of the well was the Mt Messenger Formation with...Permit38156Start Date26 September 2011FormatsPDF JPEG ZIPData TypeReport -
PR4687
Cheal-B-6 Well Completion Report
Cheal-B6 was drilled to evaluate the hydrocarbon potential of an upper Miocene amplitude anomaly in PMP 38156. The primary target of the well was the Mt Messenger and Urenui...Permit38156Start Date28 December 2011FormatsPDF JPEG ZIPData TypeReport -
PR4686
Cheal B5 Well Completion Report
Cheal-B5 is a deviated exploratory well designed to evaluate the hydrocarbon potential of an upper Miocene amplitude anomaly in PMP 38156. The primary target of the well was the...Permit38156Start Date04 November 2011FormatsPDF JPEG ZIPData TypeReport -
PR4685
Cheal A10 Well Completion Report
Cheal-A10 is a deviated exploratory-appraisal well designed to evaluate the hydrocarbon potential of an upper Miocene amplitude anomaly in PMP 38156. The primary target of the...Permit38156Start Date27 February 2012FormatsPDF JPEG ZIPData TypeReport -
PR4684
Cheal A9 Well Completion Report
Cheal-A9 is a deviated exploratory-appraisal well designed to evaluate the hydrocarbon potential of an upper Miocene amplitude anomaly in PMP 38156. The primary target of the...Permit38156Start Date11 February 2012FormatsPDF JPEG ZIPData TypeReport -
PR4683
Cheal A8 Well Completion Report
Cheal-A8 is a deviated exploratory-appraisal well designed to evaluate the hydrocarbon potential of an upper Miocene amplitude anomaly in PMP 38156. The primary target of the...Permit38156Start Date14 October 2011FormatsPDF JPEG ZIPData TypeReport -
PR4511
Petrophysical Review Canterbury Basin Wells
Petrophysicalz Solution was contracted by New Zealand Petroleum and Minerals to provide a Petrophysical Evaluation Database for Petroleum Wells within the Canterbury Basin. The...PermitCROWNStart Date30 May 2010FormatsPDF XLS JPEG ZIPData TypeReport -
PR4505
New Zealand Stratlink-Canterbury Basin and Great South Basin chronostratigraphic transects
The New Zealand Stratlink project was a joint project between GNS Science and NZ Petroleum & Minerals looking at Chronostratigraphy within the New Zealand Basins. Included...PermitCROWNStart Date30 January 2012FormatsPDF JPEGData TypeReport -
PR4504
New Zealand Stratlink-Onshore Northland Basin to Bay of Plenty Chronostratigraphic Transects
The New Zealand Stratlink project was a joint project between GNS Science and NZ Petroleum & Minerals looking at chronostratigraphy within the New Zealand Basins. Included...PermitCROWNStart Date30 September 2011FormatsPDF JPEGData TypeReport -
PR4503
New Zealand Stratlink-East Coast Basin Chronostratigraphic transects
The New Zealand Stratlink project was a joint project between GNS Science and NZ Petroleum & Minerals looking at Chronostratigraphy within the New Zealand Basins. Included...PermitCROWNStart Date28 February 2011FormatsPDF JPEG PNGData TypeReport -
PR4502
New Zealand Stratlink-Taranaki Basin chronostratigraphic transects
The New Zealand Stratlink project was a joint project between GNS Science and NZ Petroleum & Minerals looking at Chronostratigraphy within the New Zealand Basins. Included...PermitCROWNStart Date30 October 2010FormatsPDF JPEGData TypeReport -
PR4499
WM Survey Reprocessing Report
Excel Geophysical Services (NZ) Ltd was contracted by OMV New Zealand Ltd to reprocess part of the WM survey within and around PEP 53537, offshore Taranaki. A total of 494 km...Permit53537Start Date30 April 2012FormatsPDF JPEG ZIPData TypeReport