-
PR3918
McKee-8 Workover Report
Workover report for McKee-8 located within PMP 38086, onshore Taranaki. McKee-8 was originally drilled and completed by Petrocorp Exploration Ltd during June-July 1987. A...Permit38086Start Date31 October 2008FormatsPDFData TypeReport -
PR3491
Waihapa-4 Wireline Logs
This report consists of four wireline logs run August - October 2006 from the re-entry of Waihapa-4. Waihapa-4 was originally drilled 14 December 1988 in PML 38140, Taranaki,...Permit38140Start Date02 October 2006FormatsPDFData TypeReport -
PR3418
Kupara-1A Perforation Log
PDF log showing the perforation of Kupara-1A. Showing the 51 shots used to perforate the 7in casing from 1394-1397m (older tif image loaded as PR3418L1)Permit38138Start Date30 March 2006FormatsPDFData TypeReport -
PR3417
Waihapa-2 Pipe Recovery & Perforation Log
2 Paper logs of Waihapa-2 showing the 60 hole perforated in the 5.5in casing between 1630-1639m.Permit38140Start Date10 March 2006FormatsPDFData TypeReport -
PR3317
Niagara-1 re-entry report
Re-entry operations were initiated on the 26th of April 2005.; The rig used for the cleaning out of the top half of the hole (above the bridge plug at 568m) was a non-...Permit38512Start Date01 January 2006FormatsPDF TIFData TypeReport -
PR3316
Blackwater-1. Re-entry.
The re-entry of Blackwater-1 commenced on the 3rd of April 2005 and was re-drilled to 637mTVD. The aim of the re-entry project was to identify any stability issues with the well...Permit38522Start Date01 January 2006FormatsPDFData TypeReport -
PR3131
Cheal-1 Re-Entry Report
Cheal-1 was re-entered by the Indo-Pacific Energy operated PEP38738 joint venture in 2003 to complete the well so that the Urenui Formation could be flow tested. Re-entry of...Permit387382 +Start Date01 January 2003FormatsPDFData TypeReport -
PR2896
Moturoa-2 re-entry well completion report
This report summarises activities during the re-entry Moturoa-2 by Greymouth Petroleum in mid 2003. The objective of the re-entry was to access the current status of fluids in...Permit38464Start Date01 January 2003FormatsPDFData TypeReport -
PR2508
Republic New Plymouth-4 Re-entry - Plan and Completion Reports. PEP 38464 Moturoa Field, Onshore Taranaki.
Republic New Plymouth-4 was re-entered to test the fluid properties and productive potential of the Blenheim interval (675-681 m RKB) which has previously tested for a short...Permit38464Start Date01 January 2000FormatsPDFData TypeReport -
PR2133
Waihapa-1 re-entry logs. PML38140.
Two wireline logs produced from the re-entry and workover of Waihapa-1, conducted in April-May 1995. No accompanying text.Permit38140Start Date01 January 1995FormatsPDFData TypeReport -
PR2079
PPL 38706. Ngatoro-1 Downhole completion report.
Ngatoro-1 was originally drilled by Petrocorp Exploration Ltd and spudded in December 1983. It was plugged and abandoned after subcommercial DSTs were carried out in the McKee...Permit38706Start Date01 January 1994FormatsPDFData TypeReport -
PR2040
Tuhua-1 Re-entry Report.
Tuhua-1 Re-entry programme details the workover which includes removing the existing completion, clean out and recompletion with a single in the Mangahewa and an alternate in...Permit38086Start Date01 January 1994FormatsPDFData TypeReport -
PR1947
Waihapa-1, Waihapa-1A, Waihapa-1B. Re-entry Report.
Report consists of 10 logs only generated during re-entry programme. No accompanying text. NB: Waihapa-1C is not a separate well, but a testing programme conducted over the...Permit38140Start Date01 January 1988FormatsPDFData TypeReport -
PR1933
Tipoka-1A, Re-entry Downhole Completion Report. PPL38702.
Tipoka-1A was re-entered to test the fluid properties and reservoir potential of a Mangaa Sandstone unit located at between 2078 and 2087 m. During drilling a large gas peak was...Permit38702Start Date01 January 1993FormatsPDFData TypeReport