Workover report for McKee-8 located within PMP 38086, onshore Taranaki. McKee-8 was originally drilled and completed by Petrocorp Exploration Ltd during June-July 1987. A workover was then carried out in 2006 by Fletcher Challenge Energy replacing some tubing and a ultra sonic Imaging log was ran. It then developed a tubing leak in early 2008 which precluded gaslift assisted production. In 2008 a workover was planned to replace the upper continuation tubing to remediate this problem however due to major difficulties the well was plugged and abandoned.