PR5837
Mangahewa-23 Stimulation and Activities Report
This report summarizes the stimulation and testing activities for Mangahewa-23 within PMP38150, onshore Taranaki Basin. Testing operations commenced on 18.02.2020 and were...Permit38150Start Date18 February 2020FormatsPDF ZIPData TypeReport -
PR5851
Turangi-8 Well Stimulation and Testing Activities
This report by Greymouth Petroleum summarizes the well stimulation and testing activities completed in Turangi-8 within PMP38161. Fracture treatments were executed in all...Permit38161Start Date10 November 2019FormatsPDFData TypeReport -
PR5765
Kowhai-5 Well Stimulation & Testing Activities
This report by Greymouth Petroleum Mining Group details the well stimulation and testing activities for Kowhai-5. The aim of the operation was to stimulate and test the...Permit51378Start Date21 December 2018FormatsPDF ZIPData TypeReport -
PR5845
Turangi-7 Well Stimulation and Testing Activities
This report by Greymouth Petroleum summarizes Turangi-7 well stimulation and testing activities in PMP38161, Taranaki Basin. The aim of the operation was to stimulate and test...Permit38161Start Date31 August 2019FormatsPDFData TypeReport -
PR5804
Mangahewa-29 Stimulation and Testing Activities Report
This report summarises the stimulation and testing activities for Mangahewa-29 carried out between 10.09.2019 and 24.10.2019, and is an addendum to the well completion report...Permit38150Start Date08 January 2020FormatsPDF ZIPData TypeReport -
PR5093
PMP 51378 Kowhai Field - Well testing results 2015
Three wells have been drilled as part of the Kowhai Field well testing program (Kowhai-A1R, Kowhai-2 and Kowhai-3). So far results have been encouraging with Kowhai-A1R and...Permit51378Start Date02 December 2009FormatsPDF ZIPData TypeReport -
PR4337
Kowhai-A1R Testing Update
This report compiles all the well testing activities that have been carried out on the well Kowhai A1R and reservoir performance analysis. Included in this report is a summary...Permit51378Start Date30 May 2011FormatsPDF ZIPData TypeReport -
PR5805
Mangahewa-30 Stimulation and Testing Activities Report
This report summarises the stimulation and testing activities for Mangahewa-30 carried out between 15.09.2019 and 22.10.2019, and is an addendum to the well completion report...Permit38150Start Date15 September 2019FormatsPDF ZIPData TypeReport -
PR5796
Mangahewa-27 Stimulation and Testing Activities Report
This report summarises the stimulation and testing activities for Mangahewa-27 carried out between 10.07.2019 and 04.09.2019, and is an addendum to the well completion report...Permit38150Start Date10 July 2019FormatsPDF ZIPData TypeReport -
PR5768
Mangahewa-26 Stimulation and Testing Activities Report
This report summarises the stimulation and testing activities for Mangahewa-26 carried out between 22.04.2019 and 14.07.2019, and is an addendum to the well completion report...Permit38150Start Date22 April 2019FormatsPDF ZIP lasData TypeReport -
PR5797
Mangahewa-28 Stimulation and Testing Activities Report
This report summarises the stimulation and testing activities for Mangahewa-28 carried out between 15.07.2019 and 04.09.2019, and is an addendum to the well completion report...Permit38150Start Date15 July 2019FormatsPDF ZIPData TypeReport -
PR5767
Mangahewa-25 Stimulation and Testing Activities Report
This report summarises the stimulation and testing activities for Mangahewa-25 carried out between 12.04.2019 and 12.07.2019, and is an addendum to the well completion report...Permit38150Start Date12 April 2019FormatsPDF ZIPData TypeReport -
PR5846
Kowhai-6 Well Stimulation and Testing Activities
This report by Greymouth Petroleum summarizes Kowhai-6 well stimulation and testing activities in PMP51378, Taranaki Basin. The aim of the operation was to stimulate six and...Permit51378Start Date31 May 2019FormatsPDFData TypeReport -
PR5817
Kaimiro-1 ST2 Well Testing Report (Addendum to PR5759)
This report discusses well testing activities carried out on the Kaimiro-1 ST2 well in PMP 38148, onshore Taranaki Basin. No stimulations were preformed. The upper 19m of pay is...Permit38148Start Date01 March 2019FormatsPDFData TypeReport -
PR5731
Radnor-2 Well Stimulation and Testing Activities Report
This report discusses well stimulation and testing activities carried out on the Radnor-2 well in PMP 38157, onshore Taranaki Basin. Two intervals were hydraulically fractured...Permit38157Start Date27 November 2018FormatsPDFData TypeReport -
PR5634
Cheal-D1 and Cheal-E8 Well Test Analysis Report
Testing of Cheal D-1 and Cheal E-8 in PEP54877, Taranaki Basin, confirmed the presence of moveable hydrocarbons at the Urenui A interval for both wells. Production testing on...Permit54877Start Date10 December 2018FormatsPDF ZIPData TypeReport -
PR5646
Kaimiro-5 ST1 Moki Investigation Study
This report discusses the Moki investigation study performed on Kaimiro-5 ST1 in 2018 by Greymouth Petroleum Central Limited within PMP 38148. The study objective was to...Permit38148Start Date10 October 2018FormatsPDFData TypeReport -
PR5747
Radnor-2 Flaring Activities Report
This report discusses flaring carried out at the Radnor-2 well during 2018, and was provided in accordance with the consent to flare gas (petroleum number FLR-38157-18.01). This...Permit38157Start Date31 October 2018FormatsPDFData TypeReport -
PR5699
Radnor-1B Well Stimulation & Testing Activities
This report discusses well stimulation and testing activities carried out on the Radnor-1B well in PMP 38157, onshore Taranaki Basin. A single interval was stimulated in July...Permit38157Start Date30 September 2018FormatsPDFData TypeReport -
PR5620
PMP38156 Cardiff-3ST1 Well-Stimulation and Testing
Cardiff-3 ST1 was drilled, completed and tested in 2014 and it remained shut-in until November 2016. Tests were conducted in November 2016 and an additional testing was...Permit38156Start Date10 September 2018FormatsPDF ZIPData TypeReport