Report

Cheal-D1 and Cheal-E8 Well Test Analysis Report

Login to download

Testing of Cheal D-1 and Cheal E-8 in PEP54877, Taranaki Basin, confirmed the presence of moveable hydrocarbons at the Urenui A interval for both wells. Production testing on Cheal D-1 observed a peak gas rate of 2,561 mscf/d on a 24/64in choke (FTHP 800 psig). Gas rates ended up averaging 380 mscf/d on a 64/64in choke. Cheal D-1 was deemed to be uneconomic and was suspended pending further investigation. Production testing on Cheal E-8 observed rates of 169 bopd and 775 mscf.d of gas on a 20/64in choke (FTHP 460 psig). An increasing GOR (>3000 scf/bbl) was observed on the main flow period, suggesting original reservoir pressure was at or below bubble point (Rs at Pb 870 scf/bbl). Cheal E-8 was tied into surface facilities following testing.

Report ID pr5634
Class Petroleum
Type Well Report - Test
Permit 54877
Operator Cheal Petroleum Ltd.
Commodity Petroleum
Region Taranaki Basin
Start Date 10 December 2018
End Date 10 December 2018
Report extents in GeoJSON
Author Dowman Ben
Data Format
  • PDF
  • ZIP