Report

Radnor-1B Well Stimulation & Testing Activities

Login to download

This report discusses well stimulation and testing activities carried out on the Radnor-1B well in PMP 38157, onshore Taranaki Basin. A single interval was stimulated in July 2018. The aim of the work was to stimulate and test the Mckee interval in the well. The operation resulted in gas and water production from the McKee Formation.

Report ID pr5699
Class Petroleum
Type Well Report - Test
Permit 38157
Operator Greymouth Petroleum Central Ltd.
Commodity Petroleum
Region Taranaki Basin
Start Date 30 September 2018
End Date 30 September 2018
Report extents in GeoJSON
Author Kumaravel Arun
Data Format
  • PDF