PR5811
Mangahewa-29 Well Completion Report
This report by Todd Energy summarizes the drilling of Mangahewa-29 in PMP 38150, Taranaki Basin. Mangahewa-29 was spud on 27.06.2019 and reached a total depth of 4615 m MDBRT on...Permit38150Start Date27 June 2019FormatsPDF ZIP XLSXData TypeReport -
PR5809
Mangahewa-28 Well Completion Report
This report by Todd Energy Ltd details the drilling of Mangahewa-28 in PMP38150, Taranaki Basin. Mangahewa-28 was spud on 14.05.2019 and reached a total depth of 5412 m MDBRT on...Permit38150Start Date14 May 2019FormatsPDF ZIP XLSXData TypeReport -
PR5617
Tariki-2C Jet Pump Reinstatement Review
Tariki-2C was drilled by Fletcher Energy Taranaki Ltd in 1998 as a production well targeting the fractured Tikorangi Limestone. A total of 105 mbbls oil was produced by...Permit38138Start Date10 September 2018FormatsPDF ZIP XLSXData TypeReport -
PR5471
Turangi-6 Well Completion Report (PMP 38161)
Turangi-6 was designed as an appraisal/development well of the Turangi Field in PMP 38161. It was spudded on 11 June 2016 and directionally drilled to reach a TD of 4600m on 12...Permit38161Start Date12 April 2017FormatsPDF XLSX XLS ZIPData TypeReport -
PR5059
PEP 38526: Cross Roads-1 Well Completion Report
Cross Roads-1, a vertical exploration well, was spudded on the 6th of June 2014 in PEP38526 (Petroleum Creek Ltd), onshore West Coast Basin. The objective was to investigate the...Permit38526Start Date10 March 2015FormatsPDF ZIP XLSXData TypeReport -
PR5055
New Zealand Well Test and Wireline Formation Tester ArcGIS Project
A database of conventional well test and wireline formation tester results. This database provides an indication of the presence of movable hydrocarbons and reservoir properties...PermitCROWNStart Date30 December 2014FormatsPDF ZIP XLSXData TypeReport -
PR4726
Core Plug and Rotary Sidewall Core Descriptions- Mangahewa-11
Core sample report for the Well Mangahewa-11 located within Todd Energy Ltd Mangahewa operation PMP 38150, onshore Taranaki. This report describes 276 horizontal plugs from the...Permit38150Start Date01 May 2013FormatsPDF XLSXData TypeReport -
PR4725
Core Plug and Rotary Sidewall Core Descriptions-Mangahewa-07
Core sample report for the Well Mangahewa-07 located within Todd Energy Ltd Mangahewa operation PMP 38150, onshore Taranaki. This report describes six horizontal plugs from the...Permit38150Start Date01 May 2013FormatsPDF XLSXData TypeReport -
PR4724
Core Plug and Rotary Sidewall Core Descriptions-Mangahewa-05
Core sample report for the Well Mangahewa-05 located within Todd Energy Ltd Mangahewa operation PMP 38150, onshore Taranaki. This report describes 135 horizontal plugs from the...Permit38150Start Date01 May 2013FormatsPDF XLSXData TypeReport -
PR4452
Copper Moki-1 Well Completion Report
Copper Moki 1 is located on Cheal Rd, south of Stratford in central Taranaki, in the northern part of PEP 51150. The targets for the well were seismic amplitude anomalies in the...Permit51150Start Date21 January 2011FormatsPDF XLSX XLS ZIPData TypeReport -
PR4380
Kauri F4 Well Completion Report
Kauri-F4, a deviated production well, was spudded in PMP38155 (Origin Energy), Onshore Taranaki Basin on the 30th of March 2010 by drilling rig NRG Rover 1. A Total Depth of...Permit38155Start Date21 March 2010FormatsPDF TIF XLSX ZIPData TypeReport -
PR4299
Korimako-1 Well Completion Report
Well completion report for Korimako-1 in PEP 38619 located in the offshore Taranaki Basin. This vertical well reached a total depth of 1946m and was drilled in 105 m of water...Permit38619Start Date18 October 2010FormatsPDF XLSX XLSData TypeReport -
PR4207
PRDH37 End of Well Report, CSG Make and Viabilty of Onsite Electricty Generation Report
PRDH037 was drilled by Helidrill between 2 December 2008 and 21 January 2009 in the Paparoa Ranges to assess the CSG potential of the Pike River Coal Field. CRL Energy Ltd was...Permit38517Start Date02 December 2008FormatsPDF XLSX XLS ZIPData TypeReport -
PR3944
Turangi-2 Well Completion Report
On 14 January 2008 Greymouth Petroleum spudded development well Turangi-2 in PMP 38161, onshore Taranaki, North Island, New Zealand. The well objective was to test and produce...Permit38161Start Date14 January 2008FormatsPDF ZIP CGM XLSXData TypeReport