Report

PRDH37 End of Well Report, CSG Make and Viabilty of Onsite Electricty Generation Report

Login to download

PRDH037 was drilled by Helidrill between 2 December 2008 and 21 January 2009 in the Paparoa Ranges to assess the CSG potential of the Pike River Coal Field. CRL Energy Ltd was contracted to carry out drilling supervision and coal seam gas desorption services. PRDH037 drilled to a TD of 352.3m MD after encountering 23.39m of coal in the Brunner Formation and Paparoa Group. Short reports on coal seam gas make and viability studies of on site electricity generation are also included.

Report ID pr4207
Class Petroleum
Type Well Report - Completion
Permit 38517
Operator Pike River Coal
Commodity Petroleum
Region West Coast Basins
Start Date 02 December 2008
End Date 21 January 2009
Report extents in GeoJSON
Author P. Van Rooyen
Data Format
  • PDF
  • XLSX
  • XLS
  • ZIP