Report

Mangahewa-29 Well Completion Report

Login to download

This report by Todd Energy summarizes the drilling of Mangahewa-29 in PMP 38150, Taranaki Basin. Mangahewa-29 was spud on 27.06.2019 and reached a total depth of 4615 m MDBRT on 13.07.2019. The well targeted gas bearing intervals from multiples zones within the Eocene-aged Magahewa Formtion. Petrophysical analysis identified nine potential reservoir pay intervals for gas/condensate production.

Report ID pr5811
Class Petroleum
Type Well Report - Completion
Permit 38150
Operator Todd Energy Limited
Commodity Petroleum
Region Taranaki Basin
Start Date 27 June 2019
End Date 26 July 2019
Report extents in GeoJSON
Author Murray D
Data Format
  • PDF
  • ZIP
  • XLSX