This report provides updated plans of the entire PMP50509 permit area, showing all production flow lines, production, processing, onsite generation, and metering facilities. Four wells are located in the permit area; RNP-4 (producing), Moturoa-5 (suspended), Moturoa-6ST2 (suspended), and Moturoa-7ST1 (suspended). All are producing from the Blenheim sands. Development opportunities that have been identified include: an optimised horizontal well near the main Blenheim sand; a pilot well followed by a horizontal development well in the east Blenheim block; and a Nga Motu Dome exploration prospect. A farmout proposal is appended to this report.