Report

PMP38161 Turangi McKee Overthrust Ongoing Field Development Plan

Login to download

This report by Greymouth Petroleum Turangi Limited summarises the development plan for Turangi McKee Overthrust Field. The field is currently being developed by four wells; Urenui-1R, Ohanga-1, Ohanga-2 ST2 and Onaero-1R. The wells produce 8MMscf/d of gas and 320bopd of condensate from the overthrust McKee Formation in all wells, and the Matapo Member from Urenui-1R, and to date have produced a cumulative 13B scf of gas and 505 Mbbls condensate. For future development of the Turangi McKee Overthrust, additional drainage locations are required, these are currently under evaluation. An additional 8 inches pipeline is also under evaluation between the junction of Ohanga Road and Inland North Road and Turangi A Production Station. This will reduce the back-pressure on the existing wells to maximise ultimate recovery and in addition will provide ullage for future wells.

Report ID pr5628
Class Petroleum
Type Discussion
Permit 38161
Operator Greymouth Petroleum Turangi Limited
Commodity Petroleum
Region Taranaki Basin
Start Date 28 October 2018
End Date 28 October 2018
Report extents in GeoJSON
Author
  • A. Sedgwick
  • S. Leighton
  • A. Kumaravel
  • D. Lewis
  • J. Stevenson
  • G. Bulte
Data Format
  • PDF