This report summarises work carried out between September 2017 - 2018 in Westside New Zealand's PMP38151 (Kauri), located in the Taranaki Basin. Work completed has focused on production enhancement, as Westside had identified a combination of poor reservoir management and depletion had led to significant liquid loading in Rimu A and B wells. Only one well was on ad-hoc production when Westside acquired PMP38151 in November 2016. Gas lift was reinstated on the Rimu A and B pads, and a well intervention/clean out program was conducted on the wells. Three wells are now on production, one re-completed, and two more planned to be reinstated.