PR5686
Time Processing Report for McKee 3D - Mangahewa 3D Merge
Thrust Belt Imaging was contracted by Todd Energy to re-process the McKee 3D along with the Mangahewa 3D located in onshore Taranaki Basin. The primary goal of this processing...Permit381501 +Start Date31 January 2018FormatsPDF TXT CSVData TypeReport -
PR5666
Waitoriki 2D (TAG065-18) Processing Report
Earth Signal Processing was contracted by TAG Oil to process the TAG065-18 seismic survey within PEP57065, which was acquired by Synterra Technologies in 2018. Approximately...Permit57065Start Date30 January 2018FormatsPDF TXTData TypeReport -
MR5514
Partial Relinquishment Report Exploration Permit 54216 - Owharoa
This report discusses work completed in the relinquished portion of MEP54216 (Owharoa), Coromandel. 49 soil samples and 2 rockchip samples were collected in the relinquished...Permit54216Start Date31 January 2018FormatsPDF TXT ZIPData TypeReport -
PR5886
CSEM, TOPAS and Echo Sounder survey of the Southern Hikurangi Margin 1st - 13th November 2020: RV Tangaroa TAN2012 voyage report
This report by GNS Science summarizes the TAN2012 voyage that took place between 1 - 13 November 2020. During which controlled source electromagnetic (CSEM) data, multibeam...PermitCROWNStart Date13 November 2020FormatsPDF ZIP TXTData TypeReport -
PR5604
Cardiff-2A ST1 Well-Stimulation & Testing Report
This report discusses the well stimulation and testing activities conducted on the Cardiff-2A ST1 well in PMP38156 during June - July 2017. Stimulation was in the form of...Permit38156Start Date11 June 2018FormatsPDF TXTData TypeReport -
PR5581
Waihapa-1B Production Test
This report discusses operations undertaken by NZEC Waihapa Ltd. during late 2015 through early 2016 at Waihapa-1B in order to restore the well to production, and test whether...Permit38140Start Date13 April 2018FormatsPDF TXTData TypeReport -
PR5535
PEP51152 3D Seismic Reprocessing Report
This report describes the analysis, testing and 3D processing and merging of various 3D surveys onshore Taranaki. This work was performed in 2016 by Key Seismic Solutions Ltd....Permit51152Start Date15 June 2016FormatsPDF TXTData TypeReport -
PR5520
Taranaki Basin PEP60097 3D Seismic Reprocessing Report
This report describes the analysis, testing and 3D processing and merging of various onshore Taranaki 3D seismic surveys. This work was performed in 2016 by Key Seismic...Permit60097Start Date15 June 2016FormatsPDF TXTData TypeReport -
PR5367
PEP 38524 Scanned Paper Sections
Scanned SEGY files vectorised from raster images of paper seismic lines from surveys AS, CS, FS, PS, and W83. No report lodged only segy data available.Permit38524Start Date06 December 2008FormatsPDF TXTData TypeReport -
PR5353
PEP55781 Surface Geochemical Exploration (SGE) Processing Report 2016
NIWA was contracted by Statoil New Zealand BV to complete a geochemistry and environmental characterisation survey in the Reinga Basin, PEP55781. This Environmental Benthic...Permit55781Start Date30 June 2016FormatsPDF TXTData TypeReport -
PR5352
PEP 55781 Environmental Benthic Processing Report 2016
NIWA was contracted by Statoil New Zealand BV to complete a geochemistry and environmental characterisation survey in the Reinga Basin, PEP55781. This Environmental Benthic...Permit55781Start Date31 August 2016FormatsPDF TXT ZIPData TypeReport -
PR5256
PEP 55794 Toroa Marine Gravity and Magnetic Data Processing Report 2015
Processing Report for Marine Gravity and Magnetic Data in the Great South Basin for PEP 55794 (Toroa Survey). Report has been prepared by Bridgeporth for permit operator...Permit55794Start Date31 August 2015FormatsPDF TXT ZIP TIFData TypeReport -
PR5254
PEP 55793 Marine Gravity and Magnetic Data Processing Report 2015
Processing Report for Marine Gravity and Magnetic Data in the Taranaki Basin for PEP 55793 (Vulcan 3D Survey). Report has been prepared by Bridgeporth for permit operator...Permit55793Start Date30 June 2015FormatsPDF TXT ZIP TIFData TypeReport -
PR4937
PML 38839 Kapuni KA-20 and KA-20A (Sidetrack) Well Completion Report
Well completion report for Kapuni-20 and -20A (Sidetrack) within PML 38839, onshore Taranaki Basin. Kapuni-20 was spudded on 28th Feb 2013 and drilled to a depth of 978m AHBDF....Permit38839Start Date27 April 2014FormatsPDF ZIP TXTData TypeReport -
PR4773
Arakamu-1A Well Completion Report
Well Completion report for Arakamu-1A within Taranaki Ventures Ltd permit PEP 51150, Central Taranaki. The primary target for this well was a large seismic amplitude anomaly...Permit51150Start Date11 January 2013FormatsPDF ZIP TXTData TypeReport -
PR4752
Opunake-Maui 3D PSDM Project Report
Processing Report for the Opunake-Maui 3D PSDM program located within Todd Exploration Ltd permit PEP53374 and the Shell Todd Oil Services licence PML 381012. The 700 square km...Permit533741 +Start Date27 August 2013FormatsPDF ZIP TXT P190Data TypeReport -
PR4742
Southland Seismic Reprocessing
Reprocessing report for one 2D seismic line within L & M Energy Ltd permit PEP 38226, Waiau Basin. Original processing of the line LM07-226-02 was limited in frequency...Permit38226Start Date10 June 2013FormatsPDF ZIP TXTData TypeReport -
PR4631
Manutahi-D4H, ST1 & ST2 Well Completion Report, PMP38155
The Manutahi Field is a small shallow onshore heavy-oil field located on the southern side of the Taranaki Peninsula approximately 25km south of Hawera in PMP 38155. The 2011...Permit38155Start Date24 May 2011FormatsPDF TXT ZIPData TypeReport -
PR4630
Manutahi-D3H, ST1 & ST2 Well Completion Report, PMP38155
The Manutahi Field is a small shallow onshore heavy-oil field located on the southern side of the Taranaki Peninsula approximately 25km south of Hawera in PMP 38155. The 2011...Permit38155Start Date28 May 2011FormatsPDF TXT ZIPData TypeReport -
PR4629
Manutahi-D2H Well Completion Report, PMP38155