Exlploration and Production Development Plan for the permit area PMP 60454

Login to download

This report presents an update to recent studies and analysis undertaken in the Supplejack SN6 pool following the first onset of production from the Supplejack-1 well as an introduction to the later presented Field Development Plan. The latest estimations from volumetric analysis and material balance are similar, suggesting an Original Gas In Place of 1.7-1.8 Bcf. The Field Production Development Plan considers draining the SN6 to a well head pressure of 10 bar assisted by a compressor designed to handle 4MMscf/d. No additional economic prospects are identified in the permit area at this time.

Report ID pr5792
Class Petroleum
Type Discussion
Permit 60454
Operator Tamarind NZ Onshore Limited
Commodity Petroleum
Region Taranaki Basin
Start Date 14 April 2020
End Date 14 April 2020
Report extents in GeoJSON
Author German Perez Gaido