This report presents an update to recent studies and analysis undertaken in the Supplejack SN6 pool following the first onset of production from the Supplejack-1 well as an introduction to the later presented Field Development Plan. The latest estimations from volumetric analysis and material balance are similar, suggesting an Original Gas In Place of 1.7-1.8 Bcf. The Field Production Development Plan considers draining the SN6 to a well head pressure of 10 bar assisted by a compressor designed to handle 4MMscf/d. No additional economic prospects are identified in the permit area at this time.