Report

Awakino South-1 and -1 ST1 Well Completion Report

Login to download

Well completion report for deviated exploration well Awakino South-1 and Awakino South-1 ST1 in PEP 38479, offshore north Taranaki, New Zealand. Awakino South-1, spudded 30th Aug 2008, reached a total depth of 2606m AHBRT on 2nd Oct 2008 before being sidetracked as ST1. Awakino South-1 was sidetracked due to the Geo-pilot twisting off, leaving the Geo-pilot tower shaft and bit in the hole. Awakino South-1 ST1 kicked off on 9th Oct 2008 from 2509m AHBRT and reached a total depth of 3459m AHBRT on 1st Nov 2008. The well encountered hydrocarbon shows in the Mangahewa and intra-Turi Formations and was plugged and suspended before the rig was released on 15 November 2008.

Report ID pr4001
Class Petroleum
Type Well Report - Completion
Permit 38479
Operator STP Energy Pte Ltd
Commodity Petroleum
Region Taranaki Basin
Start Date 30 August 2008
End Date 15 November 2008
Report extents in GeoJSON
Author STP Energy Pte Ltd
Data Format
  • PDF
  • ZIP