Report

Tuhara-1B Well Completion Report

Login to download

Tuhara-1B was a re-entry and sidetrack of Tuhara-1, intended to intersect the Tunanui Sandstone target higher on the crest of the Tuhara Anticline. Tuhara-1B was kicked off on the 13 June 2002, by milling a slot in the 9-5/8in casing at 3586-3610 ft. The well interested the Tunanui Sandstone at 6219 ft and continued to 6300 ft. DST 1 was conducted, but the well failed to flow. Drilling resumed to 7117 ft, with the base of the Tunanui Sandstone at 6786 ft, followed by claystone-dominated Waingaromia Mudstone. A test string for DST 2 was made but did not flow. No wireline logs were run. The well was plugged and abandoned on the 9 July 2002. Report includes Notice of Intention to Drill.

Report ID pr2706
Class Petroleum
Type Well Report - Completion
Permit 38329
Operator WESTECH ENERGY NEW ZEALAND LTD
Commodity Petroleum
Region East Coast Basin
Start Date 01 January 2002
End Date 31 December 2002
Report extents in GeoJSON
Author Ian R Brown Associates
Data Format
  • PDF
  • TIF