-
PR5685
Mangahewa-2017 3D (17TMM3D) Time Processing Report
Thrust Belt Imaging was contracted by Todd Energy to process the Mangahewa-2017-3D seismic volume, onshore Taranaki Basin in 2017. The primary goal of this processing was to...Permit38150Start Date30 September 2017FormatsPDF ZIPData TypeReport -
PR1462
1988 Toka 3D (TA88) Reconnaissance Survey, PPL 38437
This report consists of seismic lines for the TA88-600, 700 & 800 series. No associated reports were lodged. Index numbers for enclosures 98 and 113 were omitted and...Permit38437Start Date01 January 1988FormatsPDF TIFData TypeReport -
PR1253
Field Area Report on a Seismic Reflection Survey Conducted in PPL 38034.
Ref: Text PR 1252. 231.8km seismic data recorded.Permit38034Start Date01 January 1985FormatsPDF TIFData TypeReport -
PR1219
Final Report of Operation and Field Work In Prospect Area Taranaki, Maui PML381012.
The 86MA seismic reflection survey was shot in the Maui field area, PML 381012, by Western Geophysical for Shell BP Todd. The survey commenced on March 4th 1986, and was...Permit381012Start Date01 January 1986FormatsPDF TIFData TypeReport -
PR1756
1988 reprocessed HF, P107-84 data for PPL38107
44 lines from offshore north Taranaki (PPL38107) reprocessed by New Zealand Oil and Gas Ltd in 1988. Survey lines HF, P107-81 and P107-84 examined. No accompanying reports...Permit38107Start Date01 January 1988FormatsPDF TIFData TypeReport -
PR4333
2010 Kerry 3D Seismic Interpretation Report, offshore Taranaki Basin, New Zealand
Reprocessing report undertaken by Origin Energy on the Kerry 3D seismic Survey in the Taranaki Basin undertaken in 1996. This report covers regional geology, previous work,...Permit38146Start Date01 May 2011FormatsPDFData TypeReport -
PR1662
Offshore Taranaki PPL38418 Reprocessing.
Reprocessing undertaken by Petroleum Corporation of NZ PPL38418. Survey lines 80E, MA, Maui C, Maui E, Maui F, NM and WM examined. No accompanying report.Permit38418Start Date01 January 1988FormatsPDF TIFData TypeReport -
PR5719
McKee 3D Seismic Interpretation Report
This report by Todd Energy details the 2018 interpretation of the McKee Field, onshore Taranaki Basin. Five datasets were used in the interpretation project and the 2017...Permit38086Start Date31 August 2018FormatsPDFData TypeReport -
PR627
Marine seismic survey PPL 682. Report on digital data processing.
Marine seismic data has been digitally recorded by MV Prospekta of Prakla-Seismos GMBH in the areas of NZ, Taranaki Offshore, on behalf of Shell BP and Todd Oil Services Ltd...Permit6821 +Start Date01 January 1979FormatsPDF TIFData TypeReport -
PR881
Marine Seismic Survey.Offshore Taranaki (Block E), PPL 38055.
Enclosures only - no accompanying report.Permit38055Start Date01 January 1980FormatsPDF TIFData TypeReport -
PR5752
2018 Maui 4D Final Processing Report
This report discusses the 2018 4D reprocessing of 3 vintages of the Maui marine seismic survey within PML381012, offshore Taranaki. The report covers the full processing route...Permit381012Start Date01 February 2018FormatsPDF ZIPData TypeReport -
PR3055
Seismic Interpretation Report - Spectrum Reprocessing Northland Basin, New Zealand
This report covers interpretation of approximately 9,000 km of 2D seismic data from the Northland Basin, New Zealand, which were acquired in 1995 and reprocessed in 2004 to pre-...Permit38615Start Date01 January 2004FormatsPDF TIF ZIPData TypeReport -
PR628
Marine seismic survey PPL687.
Marine seismic survey of North Taranaki Basin by Prakla. 24-fold seismic reflection data. Enclosures: Shot Point Map and Seismic Sections. No accompanying report.Permit687Start Date01 January 1974FormatsPDF TIFData TypeReport -
PR3158
PEP38215 Reprocessing
This report comprises the seismic data reprocessed in PEP 38215, Great South Basin, New Zealand. The project comprised the reprocessing of all lines in the permit. 115 lines,...Permit38215Start Date01 January 2003FormatsPDF TIF ZIPData TypeReport -
PR3294
DUN06 Seismic Survey
Crown Minerals contracted Multiwave Geophysical Company to acquire a 2D marine seismic survey, DUN06, in the Great South Basin. between 14 February and 29 March 2006. 19 lines...PermitCROWNStart Date01 January 2006FormatsPDF ZIPData TypeReport -
PR5667
AVO Analysis of Waitoriki 2D (TAG065-18) Seismic Data
Seismic AVO inversion was carried out on two seismic lines from the Waitoriki 2D (TAG065-18) seismic survey acquired in 2018 within PEP57065 held by TAG Oil. Shallow Mt....Permit57065Start Date30 September 2018FormatsPDFData TypeReport -
PR3412
Seismic Refraction Survey, Waikawau, South Waikato
GNS contracted Drillwell Holdings New Zealand Limited to shoot a seismic refraction survey from the 16th to 29th of August 2006 along Te Marama Road, Waikawau, South Waikato,...Permit38729Start Date07 February 2006FormatsPDF ZIPData TypeReport -
PR3335
TAWN 2D Processing Project
In June 2005 Grant Geophysical acquired for Swift Energy nine 2D seismic lines over the TAWN Licences (Piakau - Ahuroa -Tariki), a total of 91 km (SENZ06). The processing was...Permit381383 +Start Date01 June 2005FormatsPDF ZIPData TypeReport -
PR4158
Pegasus Basin, Bounty Trough and SAKHE Seismic Acquisition Report
RPS was contracted by Crown Minerals to provide supervision, offshore quality control and operational administration of the 2009/2010 Crown funded 2D seismic acquisition...PermitCROWNStart Date07 July 2010FormatsPDF ZIPData TypeReport -
PR4480
2011 Te Whatu 2D Processing
Processing report for the 2011 Te Whatu Survey within Todd Exploration Ltd permit PEP 51313, offshore Taranaki. This survey comprised 807.92 km across 31 lines. The objective of...Permit51313Start Date02 April 2011FormatsPDF XLS ZIPData TypeReport