-
PR5789
Radnor Field Review of Exploration and Production Development Plan
This report by Greymouth Petroleum for PMP 38157, Taranaki Basin, presents a review of an exploration and production development plan for the entire permit area based on recent...Permit38157Start Date31 March 2020FormatsPDFData TypeReport -
PR5772
Review of Well Status, Formation Damage and Artificial Lift Strategies, Arakamu Wells
This report by Taranaki Ventures Ltd, summarises work undertaken as part of the Arakamu appraisal programme for PEP51150, Taranaki Basin. A wireline pressure/temperature survey...Permit51150Start Date22 March 2020FormatsPDF ZIPData TypeReport -
PR5776
Compilation of CMR analyses of Kauri & Manutahi Wells
This compilation report by WestSide Corporation, details the analysis and interpretation of the CMR logs that are available for wells in the Rimu-Kauri-Manutahi Fields, PMP...Permit38155Start Date20 March 2020FormatsPDF ZIPData TypeReport -
PR5837
Mangahewa-23 Stimulation and Activities Report
This report summarizes the stimulation and testing activities for Mangahewa-23 within PMP38150, onshore Taranaki Basin. Testing operations commenced on 18.02.2020 and were...Permit38150Start Date18 February 2020FormatsPDF ZIPData TypeReport -
PR5851
Turangi-8 Well Stimulation and Testing Activities
This report by Greymouth Petroleum summarizes the well stimulation and testing activities completed in Turangi-8 within PMP38161. Fracture treatments were executed in all...Permit38161Start Date10 November 2019FormatsPDFData TypeReport -
PR7199
PEP 60093 Partial Relinquishment Report
This partial relinquishment report provides a summary of prospectivity within the area being relinquished from PEP 60093, Taranaki Basin, by OMV New Zealand Limited. The only...Permit60093Start Date01 April 2016FormatsPDFData TypeReport -
PR5375
Kora 3D Seismic Survey; Acquisition Report
This is the Acquisition Report for the Kora 3D survey carried out by OMV between the 18th of December 2005 to the 1st of March, 2006. The 3D seismic survey was carried out...Permit38485Start Date18 December 2005FormatsPDF ZIPData TypeReport -
PR558
Preliminary Results of Geophysical Work in the Offshore Waters South Island.
Approximately 17330 km of geophysical data were recorded during seven months of operations. Preliminary interpretation of the shipboard monitor sections indicated some areas...Permit69513 +Start Date01 January 1971FormatsPDF TIF TIFFData TypeReport -
PR3891
Hunt International Offshore Canterbury Seismic Survey
Hunt International acquired two seismic lines Offshore Canterbury during 1970/1971. Probably reconnaissance work described in PR558. The two lines were most likely shot by the...Permit705Start Date31 December 1971FormatsPDF TIFData TypeReport -
PR3514
Wairarapa PEP38341 & PEP38342. DG06 Seismic Programme: Data Quality Review and Forward Plan
The DG06 Seismic programme was shot in PEP 38341 and 38342, Wairarapa. RPS-Energy/ECl were contracted to analyse the data from the DG06 survey and then make recommendations to...Permit383421 +Start Date08 September 2007FormatsPDFData TypeReport -
PR5788
PEP60273 Tuihu 2D Seismic Reprocessing Interpretation Report
In 2019 Kenmore Geophysical reprocessed 389 km of 2D seismic data from onshore Taranaki Basin for Todd Exploration Management Services Limited, 219 km of which lie in PEP60273...Permit60273Start Date01 March 2020FormatsPDFData TypeReport -
PR5765
Kowhai-5 Well Stimulation & Testing Activities
This report by Greymouth Petroleum Mining Group details the well stimulation and testing activities for Kowhai-5. The aim of the operation was to stimulate and test the...Permit51378Start Date21 December 2018FormatsPDF ZIPData TypeReport -
PR5847
Turangi-9 Well Completion Report
Turangi-9 is a Turangi field development well drilled in PMP 38161, Taranaki Basin. The well spudd on 18/12/2019 and was directionally drilled to a depth of 5145 mMD....Permit38161Start Date18 December 2019FormatsPDF ZIP .pdfData TypeReport -
PR5845
Turangi-7 Well Stimulation and Testing Activities
This report by Greymouth Petroleum summarizes Turangi-7 well stimulation and testing activities in PMP38161, Taranaki Basin. The aim of the operation was to stimulate and test...Permit38161Start Date31 August 2019FormatsPDFData TypeReport -
PR7185
Blenheim-1 Well Abandonment Report
Blenheim-1 was drilled in the early 1900s by the Blenheim Oilwell Reclamation Co Ltd, and was inadequately plugged and abandoned with hydrocarbons leaking to surface. Work was...PermitCROWNStart Date11 March 2003FormatsPDFData TypeReport -
PR5804
Mangahewa-29 Stimulation and Testing Activities Report
This report summarises the stimulation and testing activities for Mangahewa-29 carried out between 10.09.2019 and 24.10.2019, and is an addendum to the well completion report...Permit38150Start Date08 January 2020FormatsPDF ZIPData TypeReport -
PR5764
Gladstone-1 Well Abandonment Report
The Gladstone-1 exploration well was spudded on 30th November 2019 within PEP 57075 (Cloudy Bay), offshore Taranaki Basin. The COSL Prospector drilled the vertical well to a...Permit57075Start Date30 November 2019FormatsPDFData TypeReport -
PR5841
Gladstone-1 Well Completion Report
Gladstone-1 was drilled by OMV New Zealand Ltd. in exploration permit 57075 (Cloudy Bay), to assess a Middle Miocene channel complex (Gladstone prospect). Trap mechanism...Permit57075Start Date27 December 2019FormatsPDF ZIPData TypeReport -
PR5755
Mangahewa 17TMM3D Seismic Interpretation Report - PMP38150
This report by Todd Energy for PMP38150 summarizes the geophysical interpretation made of the recently acquired Mangahewa 2017 3D seismic survey. More distinct reservoir...Permit38150Start Date31 December 2019FormatsPDFData TypeReport -
PR5771
Radnor Field Activity Update PMP38157
This report by Greymouth Petroleum for PMP38157 details the review of the Radnor Field Development incorporating all new information since May 2017 and presents the current...Permit38157Start Date05 November 2019FormatsPDFData TypeReport