Report

Taranaki Basin New Zealand PPL 38073 Annual report.

Login to download

Presented is an Annual Report for PPL 38073, Taranaki Basin, NZ. Enclosed is a Top Tikorangi Limestone map which shows the lead in the southeast of the permit has mapped as a non prospective northwest plunging structural nose. This map has confirmed the Waitara Prospect as a fault controlled structural closure of 37.3 sq kms. However, due to the discontinuous nature of the Tikorangi Limestone reflector on P83-111, Petrocorp proposed to investigate the availability of the DSIR research vessel to conduct a gravity and magnetics survey over the Waitara Prospect.

Report ID pr978
Class Petroleum
Type Geophysical
Permit 38073
Operator PAN CONTINENTAL PETROLEUM LTD
Commodity Petroleum
Region Taranaki Basin
Start Date 01 January 1983
End Date 31 December 1983
Report extents in GeoJSON
Author Pan Continental Petroleum
Data Format
  • PDF
  • TIF