Report

Waihapa Ngaere Enhanced Oil Project Reveiw

Login to download

This report by NZEC (Waihapa) Ltd summarizes the review of phase three of the Enhanced Oil Project, which is to improve oil production from the Waihapa-Ngaere oilfiled. The objective of phase three is focusing on the installation of one or more electrical submersible pump(s) (ESP) in existing production wells to increase fluid offtake from the field. The outcome of this review is that an ESP is recommended to be installed at Ngaere-1. In Q1 2019 an ESP was successfully run in Ngaere-1.

Report ID pr5736
Class Petroleum
Type Well Report - Completion
Permit
  • 38140
  • 38141
Operator NZEC Waihapa Ltd
Commodity Petroleum
Region Taranaki Basin
Start Date 30 September 2019
End Date 30 September 2019
Report extents in GeoJSON
Author
  • Simon Ward
  • David Hoke
  • Jenny Wells
Data Format
  • PDF