Report

Tariki Sandstone, Rimu Limestone and Manutahi Sandstone Reservoir Development Plan

Login to download

This report presents a development plan for the Tariki Sandstone, Rimu Limestone and Manutahi Sandstone reservoirs within PMP 38151 and PMP 38155, Onshore Taranaki Basin. The Kauri Sandstone reservoir development strategy discussed in a separate report (PR5741). Short-term future production is to continue from existing producing wells, with an appraisal plan being drafted to identify at least one location for drilling from an existing well site to evaluate the extent of the Tariki Sandstone and Rimu Limestone within the permit areas.

Report ID pr5735
Class Petroleum
Type Discussion
Permit
  • 38151
  • 38155
Operator Westside New Zealand Ltd.
Commodity Petroleum
Region Taranaki Basin
Start Date 23 September 2019
End Date 23 September 2019
Report extents in GeoJSON
Author Paris Pedro
Data Format
  • PDF