Report

Mangahewa-03 Testing - Stimulation and Testing Activities Report

Login to download

This report discusses stimulation and testing activities carried out on well Mangahewa-03. Testing operations were preformed from 22 Jun - 31 Jul 2018, with the well switched to plant via a test separator and sand catcher during testing as soon as pressure was sufficient to push gas and fluids down the pipeline. The well was a strong gas producer with a low water rate. Eight zones were perforated and fracced and comingled for testing.

Report ID pr5644
Class Petroleum
Type Well Report - Test
Permit 38150
Operator Todd Energy Ltd.
Commodity Petroleum
Region Taranaki Basin
Start Date 22 June 2018
End Date 31 July 2018
Report extents in GeoJSON
Author Braggins Ben
Data Format
  • PDF
  • ZIP