Cheal D-1 was drilled, completed, and tested during July and August 2017 within PEP54877, Onshore Taranaki. This report outlines the testing activities carried out over two test periods. The aim of testing was to evaluate the hydrocarbon bearing Urenui A Sandstone identified by petrophysical analysis of the open-hole wireline logs. A total of 2311 mscf of gas and 162 bbls of water were produced over both testing operations. The well was shut in as gas rates and volumes were deemed uneconomic. Data from the testing can be found in the enclosures to this report.