This report is an addendum to the Well Completion Report for Mangahewa-14ST1 in the Onshore Taranaki region. Mangahewa-14ST1 commenced with the setting of a whipstock within the 7 inch liner and milling a 6.125 inch diameter window from 3277 to 3281.1m MDBRT. Kick-off was on the 05 November 2015 and the sidetrack was drilled using a 6.125 inch bit run to reach total depth of 4725m MDBRT, on 14 November 2015. Total depth was within the Mangahewa Formation MaA1 reservoir. The well was completed as a 4.5 inch cemented monobore completion. Lower completion 130 joints,HP1-13Cr95, 13.5ppf, with JFE Bear and TSH563 connections.