Report

Maari 3D MAZ PreSDM Project 2012

Login to download

Processing report for the Maari 3D MAZ PreSDM 2012 Project, undertaken by OMV New Zealand Ltd covering the permits PEP 51906, PMP 38160 and PEP 51313. This project comprised the 1999 Maari 3D and the 2012 Maari 3D which was shot over the same area. Four main datasets were produced; 2012 vintage PreSTM datasets, 1999 vintage PreSDM datasets, 2012 PreSDM datasets and the 1999/2012 Merge PreSDM MAZ datasets. These datasets used a wide range of processing tools, with the displays mentioned in the report loaded as enclosures. The enclosures loaded as part of this report number are only those related to the Merge MAZ dataset-see file listing at the start of the report. For those displays and datasets that are specifically related to the 1999 vintage see enclosures for PR4762 and for 2012 see enclosures for PR4761.

Report ID pr4778
Class Petroleum
Type Geophysical - seismic
Permit
  • 51906
  • 51313
  • 38160
Operator OMV New Zealand Ltd
Commodity Petroleum
Region Taranaki Basin
Start Date 03 September 2013
End Date 03 September 2013
Report extents in GeoJSON
Author CGG Services (Australia) Pty Ltd
Data Format
  • PDF
  • ZIP