Report

PMP 51378 Kowhai-2 Well Completion Report

Login to download

Kowhai-2, an S shaped appraisal well, was spudded by Tiger Rig 1 on the 7th of January 2013 and reached a TD of 4550 mMDDF on the 5th of March 2013. Drilling was vertical from surface to 905 MD where it began to build to a maximum inclination of 22.63 degrees before falling back to vertical again. Following installation of xmas trees and pressure tesing to 10,000 psi for 15 min, the rig was then released at 12:00 on the 14th March 2013.

Report ID pr4739
Class Petroleum
Type Well Report - Completion
Permit 51378
Operator Greymouth Petroleum Acquisition Company Ltd
Commodity Petroleum
Region Taranaki Basin
Start Date 14 March 2013
End Date 14 March 2013
Report extents in GeoJSON
Author Petroleum Greymouth
Data Format
  • PDF
  • XLS
  • ZIP