Report

Birchwood-1 Well Completion Report

Login to download

Birchwood-1 was drilled between 23 July and 6 September 2007 to a TD of 543.3m MD, located in the Ohai Basin, Southland. This well intersected both the Beaumont Coal measures and Morley Coal Measures. Drilling was stopped before the well reached the New Brighton Conglomerate due to drilling difficulties. Various tests were undertaken including desorption and vitrinite reflectance. A large amount of coal was encountered and the well was capped and suspended for future testing.

Report ID pr4368
Class Petroleum
Type Geological
Permit 38220
Operator L&M Energy Ltd
Commodity Petroleum
Region Solander Basin
Start Date 23 July 2007
End Date 06 September 2007
Report extents in GeoJSON
Author Gordon K.D
Data Format
  • PDF
  • XLS
  • ZIP