Report

Kauri-F3

Login to download

On 24 December 2005 Swift Energy New Zealand Ltd spudded development well Kauri F-3 in PMP 38155, Taranaki, North Island, New Zealand. The well was designed to drain the Manutahi Sandstone reservoir in a location west of the Kauri F pad. A TD of 1234m MD was reached on 6 January 2006. The well was successful and was completed as an oil producer, the rig was released on 10 January 2006.

Report ID pr3256
Class Petroleum
Type Well Report - Completion
Permit 38719
Operator SWIFT ENERGY NEW ZEALAND LTD
Commodity Petroleum
Region Taranaki Basin
Start Date 01 January 2006
End Date 31 December 2006
Report extents in GeoJSON
Author Swift Energy New Zealand Ltd
Data Format
  • PDF