Report

Stratford-1A (Sidetrack) Well Completion Report. PML38137.

Login to download

Stratford-1A was drilled as a re-entry and sidetrack from Stratford-1. The original well was drilled in February 1983, and completed in March 1984. Stratford-1A was commenced in October 1990 and completed as a deviated gas producer on 7 June 1991. The two objectives of the well were to: (i) reduce the uncertainty in reserve estimates of in-place and recoverable hydrocarbons of the Stratford gas-condensate field; and (ii) test and assess the production characteristics of the reservoir sands near the top of the Mangahewa Formation. Includes AVO Feasibility Study, Mean Square Dip Processing Report, Formation Test Report, and Production Testing Results report.

Report ID pr2163
Class Petroleum
Type Well Report - Completion
Permit 38137
Operator PETROLEUM CORPORATION OF NZ EXPLORATION LTD
Commodity Petroleum
Region Taranaki Basin
Start Date 01 January 1990
End Date 31 December 1990
Report extents in GeoJSON
Author Petrocorp
Data Format
  • PDF
  • TIF