Review of Waihapa/Ngaere field production capability and artificial lift requirements. PML38140 PML38141.

Login to download

Jet pumping systems were installed in early 1993 in Waihapa 1 and 6 wells, as water cuts had risen above 50%, and the wells were no longer capable of natural flow. Ongoing monitoring of well production performance has indicated that the installed lift systems are not achieving a significant reduction in bottom hole flowing pressure, and potential exists for raising well production rates. It is concluded that all wells currently require or would benefit from artificial lift installation. The recommendation is to install an artificial lift when well water cut exceeds 20%. For up to 4,000 BFPD offtakes, and to keep wells flowing until ESPs can be installed, it is recommende that jet pumping be used and focus is made on improving surface equipment reliability, and reducing operating costs.

Report ID pr2031
Class Petroleum
Type Well Report - Completion
Permit
  • 38140
  • 38141
Operator PETROLEUM CORPORATION OF NZ EXPLORATION LTD
Commodity Petroleum
Region Taranaki Basin
Start Date 01 January 1994
End Date 31 December 1994
Report extents in GeoJSON
Author Holmes David
Data Format
  • PDF