Well Completion Report. Solander-1. PPL 38206.

Login to download

Solander-1 was drilled in the Southland Basin offshore from the South Coast of South Island, NZ, within PPL 38206 by BP (OE) NZ Ltd. The well was spudded on Nov 26 1985 and reached a TD of 2017.57 mBRT in igneous basement after 24 days drilling on 20 Dec 1985. The rig left location on Dec 27 1985. The well penetrated 437m of sandstone below the target Orange Horizon. There were no shows and the logs show that these sandstones ate water bearing. The well was plugged and abandoned as a dry hole.

Report ID pr1149
Class Petroleum
Type Well Report - Completion
Permit 38206
Operator BP OIL EXPLORATION CO NZ LTD
Commodity Petroleum
Region Solander Basin
Start Date 01 January 1986
End Date 31 December 1986