This report outlines the work completed by Reefton Gold Limited (RGL) within the relinquished area of Kirwans East Prospecting Permit (PP) 60554 from 27th September 2019 to 17th May 2024. Exploration from 2019–2023 consisted of soil sampling, stream sediment sampling, rock chip sampling, and a detailed magnetic survey. No work was undertaken on the relinquished area between September 2023 and May 2024. Reefton Gold applied for a subsequent exploration permit (EP 61062) over 1,996.55 ha of PP 60554 in September 2023. EP 61062 was granted on 17 May 2024. The remaining 21,872.55 ha of PP 60554 was relinquished on the grant of the subsequent EP and is detailed in this report.