Report

New Zealand Gold Project EP54216 Owharoa Annual Report 11th January 2021 to 10th January 2022

Login to download

This technical report provides a summary of all work completed by Laneway Resources for MEP 54216 between 11.01.2021 and 10.01.2022. MEP 54216 is located in the southern part of the Coromandel Peninsula and covers approximately 58 km sq within the Hauraki Goldfield. Geological mapping and geochemical sampling have been reported previously in MR5532, MR5529 and MR5776. A total of three geochemical samples were taken in 2019 but these have not been assayed yet. Proposed work for 2022 consists of drilling remaining planned diamond holes and finalising a scoping study, including metallurgical test work, as well as additional geological mapping and infill geochemical sampling as required.

Report ID mr5870
Class Mineral
Type Geological
Permit 54216
Operator Laneway Resources
Commodity
  • Gold
  • Silver
Region Waikato Region
Start Date 11 January 2021
End Date 10 January 2022
Report extents in GeoJSON
Author Ranford Catherine
Data Format
  • PDF