Report

Bendigo-Ophir Gold Project - Project Description

Login to download

This report provides a technical overview of the Bendigo Ophir gold project in MEP 60311, Otago. The targeted shear zone which is analogous to the Hyde-Macraes shear zone is mapped and inferred to extend over 30 kilometers within the project area. JORC compliant inferred resources totaling 10 Mt containing 203,000 to 253,000 oz gold at a grade of 0.6 to 0.8 gram per tonne estimated at a 0.25 gram per tonne gold cut-off grade.

Report ID mr5782
Class Mineral
Type
  • Geological
  • Resource Estimate
Permit 60311
Operator Matakanui Gold Limited
Commodity Gold
Region Otago Region
Start Date 17 June 2020
End Date 17 June 2020
Report extents in GeoJSON
Author Matakanui Gold Limited
Data Format
  • PDF