Report

Cap Burn Project - Third Technical Report For Period Ending March 22, 2020

Login to download

This report details targets, conclusions and work done on Mineral Rangahau Ltd. EP 60300 (Cap Burn) between March 2017 and March 2020. Based on the results of a surface geochemical sampling programme, five drill targets have been identified in Texture Zone 4 schist. A model is presented to show how the mineralisation could have formed via faults active in an extensional tectonic regime. Trapped fluid over-pressured TZ 4 schist at 10 to 12km depths gave rise to both mineralised conduit schist and mineralised normal faults near-surface.

Report ID mr5711
Class Mineral
Type Geochemical
Permit 60300
Operator Mineral Rangahau Limited
Commodity Gold
Region Otago Region
Start Date 22 March 2020
End Date 22 March 2020
Report extents in GeoJSON
Author
  • Kerry J. Stanaway
  • Edward A. Stanaway
Data Format
  • PDF
  • ZIP