Report

Bendigo-Ophir Project Rise and Shine Shear Zone Mineral Resource Estimates

Login to download

This report by Matakanui Gold summarizes a mineral resource estimates for Bendigo-Ophir project within MEP60311, Otago. The resource estimate is based on 2018 RC drilling data and surface sampling data. The 2018 data can be found in the enclosures to MR5619. The global mineral resource estimate for 2019 is 161,000 Oz Au from 5.41Mt at 1.0 gram per tonne Au.

Report ID mr5700
Class Mineral
Type Resource Estimate
Permit 60311
Operator Matakanui Gold Limited
Commodity Gold
Region Otago Region
Start Date 28 February 2019
End Date 28 February 2019
Report extents in GeoJSON
Author Wild Michelle
Data Format
  • PDF