This report outlines the work completed within MEP 40767-Waihi West during the reporting period December 2013 to December 2015. Recent diamond drilling has lead to the discovery of at least two new sets of veining. A 3D geological model of the new veins based on intercepts along several drillholes was created using Leapfrog. Additionally the results of multielement geochemical and TerraSpec ASD analysis undertaken on a selection of drillhole samples from within the permit is also presented in this report.