Report describes the exploration work completed by Southwest Energy Ltd at 40872 during the period between Sept 2011 to Sept 2012. It includes completion of a drilling programe (5 RC and 10 hand augered test pits), geochemical analysis of 15 drillholes, bulk sampling assays from 12 pits, priliminary resource estimate and mine scoping studies. Results from bulk testing and drilling has confirmed the presence of an economically exploitable resource enough to progress into the production/mining stage.