Report

Final Report on EP 40819 for Weston Limestone Deposit.

Login to download

This final report contains the exploration work carried out by Holcim (New Zeland) Ltd over the permit EP 40819 area until 31.12.2010. Work completed includes literature review, all topographic, geological and rock quality data compilation using Surpac, modelling them to determine the feasibility of various combinations of raw materials and correctives. Holcim decided to convert this permit to a mining permit to allow this area to be quarried in accordance with the granted resource consents.

Report ID mr4702
Class Mineral
Type Relinquishment
Permit 40819
Operator Keith Miller
Commodity
  • Aggregate
  • Industrial/Agricultural Minerals
Region Otago Region
Start Date 31 December 2010
End Date 31 December 2010
Report extents in GeoJSON
Author Holcim (New Zealand) Ltd
Data Format
  • PDF