Report

Westport Titanium Project - Preliminary resource calculation and conceptual mine plan

Login to download

A total measured, indicated and inferred resource of 6,992,000 tonnes at an average grade of 6.0 wt% ilmenite is estimated for the Westport Titanium Project, based on drill hole data collected between 1970 and 1973. It was recommended that the resource be mined by two dredge/floating plants at a rate of 100,000 tonnes per year. The disseminated nature of the resource means that the production units would have to move from one deposit to another.

Report ID mr3638
Class Mineral
Type
  • Feasibility
  • Resource Estimate
Permit
  • 31925
  • 31927
  • 31932
  • 311795
  • 312202
  • 312280
  • 312464
  • 312581
  • 312626
  • 312627
  • 322854
  • 322897
  • 322898
  • 323145
  • 323146
Operator Westport Joint Venture
Commodity
  • All Metallics
  • Iron Sand
  • Mineral Sand
Region West Coast Region
Start Date 01 January 1989
End Date 31 December 1989
Report extents in GeoJSON
Author Westport Joint Venture
Data Format
  • PDF