Report

Review of Barrier Pillar Requirements - Panel 8 Barrier to South Headings

Login to download

This report is an assessment of the barrier pillar requirements for Panel 8 against the South Headings. A 40m solid barrier pillar is recommended to maintain acceptable loading onto pillars and distance the South Heading M&M from the peak abutment load expected to be generated at 30-35m distances from Panel 8 goaf.

Report ID cr3875
Class Coal
Type Geotechnical
Permit 37175
Operator Solid Energy New Zealand Ltd
Commodity Coal
Region West Coast Region
Start Date 13 July 2009
End Date 13 July 2009
Report extents in GeoJSON
Author SCT Operations Pty Ltd
Data Format
  • PDF