Report

Huntly East Mine, Longwall Feasibility Study Part I, Preliminary Assessment.

Login to download

The report presents the findings of a preliminary review of the hydrological conditions pertaining to mining. It assesses the magnitude of the three possible hydrological problems that could affect mining, namely, the major water flow into the mine, settlement or subsidence of the ground surface as a result of drainage of the unconsolidated sediments, and modification of the surface drainage patterns. The report also outlines a programme of work to confirm the preliminary findings.

Report ID cr102
Class Coal
Type Feasibility
Permit UNASSIGNED
Operator Mines Department, Ministry of Energy
Commodity Coal
Region Waikato Region
Start Date 01 January 1983
End Date 31 December 1983
Report extents in GeoJSON
Author Mines Department Ministry of Energy
Data Format
  • PDF