Report

Proposed sulphur development work programme, Rotokaua

Login to download

This report outlines the proposed sulphur development work programme at the Rotokaua Sulphur Deposit. It is designed to complete the technical and economic assessment of the deposit. Initial work will investigate the more critical areas with the later work optimising and compiling known information. Six to ten cored boreholes are to be drilled followed by dewatering and excavation. This will allow a detailed mining plan to be drawn up and costed. If this work is successful, more work will follow.

Report ID mr621
Class Mineral
Type Feasibility
Permit UNKNOWN
Operator Fletcher Mining & Development
Commodity Industrial/Agricultural Minerals
Region
  • Bay of Plenty Region
  • Waikato Region
Start Date 01 January 1979
End Date 31 December 1979
Report extents in GeoJSON
Author Fletcher Mining & Exploration Co Ltd
Data Format
  • PDF