-
PR1284
Kupe South-1 Well Completion Report PPL 38116.
Kupe South-1 was drilled updip from Kupe-1 in PPL 38116 to test a flexural culmination defined by various vintages of seismic. The well was spudded on 30 October 1986, and the...Permit38116Start Date01 January 1987FormatsPDF TIF ZIPData TypeReport -
PR1261
Ahuroa-2, Ahuroa-2A Well Completion Report PPL 38034.
The primary objective of Ahuroa-2 was to test the Tariki Sandstone Member updip from the Ahuroa-1 and 1A intersections of the member. Ahuroa-2 drilled a reduced section of...Permit38034Start Date01 January 1987FormatsPDF TIF ZIPData TypeReport -
PR1260
Ahuroa-1, Ahuroa-1A Well Completion Report. PPL 38034.
The primary objective of Ahuroa-1 was to test the hydrocarbon-bearing potential of the Kapuni Group, but, as with Waihapa-1, 1A, 1B and Toko-1, reservoir sandstones were poorly...Permit38034Start Date01 January 1987FormatsPDF TIF ZIPData TypeReport -
PR1249
Te Kiri-1 Well Completion Report. PPL 38034.
Te Kiri-1, a vertical exploration well in PPL 38034, is designed to test the hydrocarbon potential of the Eocene Kapuni Group and the early to middle Miocene Mokau Formation...Permit38034Start Date01 January 1987FormatsPDF TIF ZIPData TypeReport -
PR1248
Tariki-1, -1A Well Completion Report PPL38034.
The purpose of this interim evaluation report of Tariki-1 is to present the Operators preliminary geological and petroleum engineering analyses and interpretations to the joint...Permit38034Start Date01 January 1987FormatsPDF TIF ZIPData TypeReport -
PR1235
Maui appraisal drilling campaign (1986) review. PML381012.
The objective of this report is to review the 1986 Maui appraisal drilling campaign. This campaign consisted of drilling wells Maui-5, -6 and -7 using the semi submersible...Permit381012Start Date01 January 1987FormatsPDF ZIPData TypeReport -
PR1231
Well Completion Report Rere-1 PPL 38082.
Rere-1 was spudded on 28 August 1985 and drilled to a final depth of 4351.5m AHBKB in 213 days. The well was plugged and abandoned as a dry hole on 4th of April 1986. The...Permit38082Start Date01 January 1986FormatsPDF TIF ZIPData TypeReport -
PR1187
Waihapa-1, -1A, -1B Well Completion Report, PPL 38034.
Waihapa-1, 1A and 1B (PPL 38034) drilled a broad N-S elongated dome, bounded to the west by a steep reverse fault. The structure is located at the southern extent of the...Permit38034Start Date01 January 1986FormatsPDF TIF ZIPData TypeReport -
PR1182
Well resume Maui-5, PML 381012, Taranaki, New Zealand
Maui-5 (PML 381012) was the first well in a three well programme designed to provide a better definition of the fields reserves and more information on the geology of the...Permit381012Start Date01 January 1986FormatsPDF ZIPData TypeReport -
PR1181
Wharehuia-1 Well Completion Report PPL 38034.
Wharehuia-1 is a vertical exploration well designed primarily to test the oil potential of the overthrust McKee Formation in the upper part of the overthrust Kapuni Group. The...Permit38034Start Date01 January 1986FormatsPDF TIF ZIPData TypeReport -
PR1146
Well completion report Galleon-1. PPL 38203.
Galleon-1 (PPL38203) tested a four way dip closed drape feature above a basement high. Some 21m of gas-condensate bearing sandstone were encountered. This represents only about...Permit38203Start Date01 January 1985FormatsPDF TIF ZIPData TypeReport -
PR1140
Awakino-1 Well Completion Report. PPL 38094.
Awakino-1 (PPL 38094) was a wildcat offshore well designed to intersect reservoir in a thrust structure similar in style and on trend with the McKee - Toetoe oil fields, onshore...Permit38094Start Date01 January 1985FormatsPDF TIF ZIPData TypeReport -
PR1100
Well Completion Report Moki-2, Moki-2A PPL 38114 Offshore Taranaki.
The well Moki-2A was drilled in the Taranaki Basin, NZ, to appraise the extent of the oil accumulation discovered by the well Moki-1 in late 1983. The well was spudded on Jan 26...Permit38114Start Date01 January 1984FormatsPDF TIF ZIPData TypeReport -
PR1089
Well Completion Report Kea-1 PPL 38114.
Kea-1 is an exploration well, designed to drill to a TD of 2900m, to evaluate a fault bound dip closure in the central northeastern section of NZ licence 38114, in the Taranaki...Permit38114Start Date01 January 1985FormatsPDF TIF ZIPData TypeReport -
PR1069
Seismic supervision report for PPL 38113 offshore New Zealand
ECL Australia Pty Ltd were retained by NZOG to supervise their 1984 Block PPL 38113, offshore NZ seismic survey. A total of 316.411kms of line data was acquired. Problems...Permit38113Start Date01 January 1984FormatsPDF TIF ZIPData TypeReport -
PR1037
Witiora-1 completion report, Offshore Taranaki. PPL 38113.
Witiora-1 is located offshore in 128.5m of water, 30km west of New Plymouth in PPL 38113. Drilling of the well fulfills the work programme for the third year of the Licence....Permit38113Start Date01 January 1984FormatsPDF TIF ZIPData TypeReport -
PR1024
Geological summary Kapuni Deep-1, Taranaki, New Zealand. PML 38839
Paleocene to Early Eocene coal measures found in Kupe-1 (PML 38839, offshore to the south) appear in seismic data to thicken to the north, and could be over 1000m thick below...Permit38839Start Date01 January 1984FormatsPDF TIF ZIPData TypeReport