MR4655
Technical Report on Waipipi to 11 January 2010
This report contains results of exploration completed by Sericho Developments Limited on EP40695 from January 2005 to January 2010. Work completed includes mapping, geochemical...Permit40695Start Date11 January 2010FormatsPDF ZIPData TypeReport -
MR3912
Barrytown mineral sands, West Coast, New Zealand. Environmental assessment.
This is an environmental assessment of the Barrytown Mineral Sands that describes the mineral resource and the proposed method of mining as well as considering the physical,...Permit3110641 +Start Date01 January 1991FormatsPDF TIFData TypeReport -
MR3901
Cobb Magnesite Project
This report consitutes all the work that L & M Mining completed in the 40535 licence. The report is in 3 parts with the first part being a discussion of the geology and...Permit40535Start Date01 January 2001FormatsPDFData TypeReport -
MR3692
Ngakuru Diatomite Project (EP 40275) - Progress Report for 12 Month Period to 28/5/99
Studies to date have shown that the Ngakuru diatomite deposit can be classified in global terms as a very accessible, medium sized quality, largely uniform deposit composed of...Permit402751 +Start Date01 January 1999FormatsPDFData TypeReport -
MR3673
Pilot scale batch leach on roasted Westport ilmenite
The procedure for a pilot batch leach on roasted ilmenite is as follows: 100kg of roasted ilmenite was prepared in the small batch roaster. Using the medium size leach vessel...Permit400833 +Start Date01 January 1997FormatsPDFData TypeReport -
MR3672
Acid leaching of roasted ilmenite
This report ties together the various ilmenite leaching methods that have been experimentally reviewed. The effect of acid strength (20-32% wt HCl) and volume of excess acid...Permit400833 +Start Date01 January 1997FormatsPDFData TypeReport -
MR3671
Scanning electron microprobe (SEM) images of supergrade synthetic rutile produced from Westport ilmenite
Report where electron microprobe images show the internal structure of the synthetic rutile BAW 1-2-3 which was used as feed material for the Ken 9 series of 2R/2L experiments.Permit400833 +Start Date01 January 1996FormatsPDFData TypeReport -
MR3670
Magnetic enhancement of ilmenite
This report is a thesis which relates to a B.E. degree. The project examines the process of partial oxidation of ilmenite in a fluidised bed roaster resulting in enhanced...Permit400833 +Start Date01 January 1995FormatsPDFData TypeReport -
MR3669
Mining ilmenite sands at Westport, New Zealand
This report describes the mining process and associated requirements for the initial nine year mine life on the Rogers property at North Nine Mile. Austpac proposes to develop...Permit400833 +Start Date01 January 1995FormatsPDFData TypeReport -
MR3668
Westport Titanium Project: Land rehabilitation study
The basic assumption of the proposed land rehabilitation plan in this study is to return the land (following mining) to pastoral purposes and to a landform similar to that which...Permit400833 +Start Date01 January 1995FormatsPDFData TypeReport -
MR3667
Westport Titanium Project: Assessment of environmental effects
This report has been prepared to support applications by Austpac for resource consent under the Resource Management Act 1991. Consent was sought from the West Coast Regional...Permit400833 +Start Date01 January 1995FormatsPDFData TypeReport -
MR3666
Interpretation of superazeotrope trials, Westport Titanium Project
This report determines if the leaching time and product quality can be improved by using 33% HCL as the leachate. To date most ilmenite leaching has been conducted using...Permit400833 +Start Date01 January 1994FormatsPDFData TypeReport -
MR3665
Westport Titanium Project - Feasibility study design report
These report documents cover the design of a demonstration facility for the production of premium grade titanium dioxide from ilmenite-bearing sands. The production process upon...Permit400833 +Start Date01 January 1995FormatsPDFData TypeReport -
MR3664
Report on research into the beneficiation of ilmenite from Westport, New Zealand and three other locations using ERMS technology
This report summarises the research programme over four years of prior bench-scale research by Austpac. The results pointed to the probability that a new generation of...Permit400833 +Start Date01 January 1995FormatsPDFData TypeReport -
MR3663
Assessment of bulk samples, Westport, New Zealand
This report (in data sheet form) describes the analysis of bulk samples collected from the Westport deposit in August 1994. Mineralogical analysis of the ore sample heavy...Permit400833 +Start Date01 January 1994FormatsPDFData TypeReport -
MR3662
Archaeological Survey, 9 Mile Beach, Westport
Arcsearch Consultancy undertook an archaeological survey on behalf of Austpac. The brief for this project included an archaeological survey of J and L Rogers property at 9 Mile...Permit400833 +Start Date01 January 1994FormatsPDFData TypeReport -
MR3661
A background report on the ERMS TiO2 process for upgrading ilmenite to produce a range of products including pigment
Austpac developed the ERMS process to facilitate the recovery of TiO2 from titaniferous heavy minerals. Austpac is seeking additional finance to fund the next phase of research...Permit400833 +Start Date01 January 1993FormatsPDFData TypeReport -
MR3660
Leaching roasted ilmenite to manufacture synthetic rutile
A thesis submitted for a B.E. degree in Chemical Engineering. This investigation involved the production of synthetic rutile from ilmenite by roasting the ilmenite followed by...Permit400833 +Start Date01 January 1991FormatsPDFData TypeReport -
MR3659
Westport Ilmenite Project - Study of infrastructure options
This study has been carried out for Austpac as part of the initial investigation phase in developing an ilmenite mining and titanium processing project at Westport. The approach...Permit400833 +Start Date01 January 1989FormatsPDFData TypeReport -
MR3658
Summary Report - Austpac Titanium Project, Westport, New Zealand
This report summarizes the status of the Westport project at the end of January 1989. The scheduling of activities will allow a feasibility study to be completed in 1989. This...Permit400833 +Start Date01 January 1989FormatsPDFData TypeReport