-
MR1303
Final report on Hohonu MPW areas, Lake Brunner
Results of 77 stream sediment samples yielded insignificant metal assays apart from Cu, which was enriched due to the presence of mafic intrusives. Prospect surrendered, no...Permit5053 +Start Date01 January 1972FormatsPDF TIFData TypeReport -
MR1296
Final report on the Inangahua Mineral Prospecting Warrants 435, 436, 440, 475 and 448/71
Two stream sediment programs (total 225 samples) did not find significant molybdenum or tungsten values, nor did UV fluorescence detect visible signs of tungsten mineralisation....Permit4354 +Start Date01 January 1972FormatsPDF TIFData TypeReport -
MR1272
Final report MPWs 8410, 8411, Pounamus
Mineralisation consists of thin discontinuous bands, 1-6 inches wide, mainly pyrite and chalcopyrite. Float in the Toaroha River assayed Cu (up to 22%), Ni (up to 0.7%), Zn (up...Permit84101 +Start Date01 January 1970FormatsPDF TIFData TypeReport -
MR1228
Plans of new and old tunnels (1935) and final plan (1939) Zalas area, Totara River, Ross
Presume lodged by Dept of Labour as a result of the gold subsidy scheme during 1930s depression.PermitUNKNOWNStart Date01 January 1935FormatsPDF TIFData TypeReport -
MR119
Final report exploration licence 33299, Northland, New Zealand
Sampling and mapping defined an area of considerable hydrothermal alteration in the upper catchment of the Waitapu and Waikoura creeks. The nature and extent of mineralisation...Permit33299Start Date01 January 1988FormatsPDF TIFData TypeReport -
MR111
Final report EL 33289, Whangaroa, Northland, New Zealand
Area was remapped and a series of overthrusts recognised and mapped. Three types of possible mineralisation, Cu, Hg and Au are discussed and a conclusion made that gold is the...Permit33289Start Date01 January 1987FormatsPDF TIFData TypeReport -
MR106
Final report on mineral exploration completed during the tenure of PL 311087 (Puketotara, Northland)
Low temp alteration and mineralisation is widespread in rhyolitic tuffs, basalts, and lacustrine deposits. Abundant py and mc, but no Au, Ag, As, or Sb anomalies. Mineralisation...Permit311087Start Date01 January 1984FormatsPDF TIFData TypeReport -
MR105
Final report on mineral exploration completed during the tenure of EL 33196, (Pupuke - Puketi area, Northland)
Mapping and sampling indicates there is little potential for epithermal precious metal mineralisation, apart from along the eastern side of the license where hydrothermal...Permit33196Start Date01 January 1984FormatsPDF TIFData TypeReport -
MR104
Exploration licence 33166 Whangaroa, Northland, New Zealand Final report
Geochemical sampling (315 rock, 180 stream, 21 pan, 4 soil) returned low values of Au, but other elements were anomalous and the area is considered to be a precious metal...Permit33166Start Date01 January 1985FormatsPDF TIFData TypeReport -
MR1035
Final report on PL 31881 Boulder Lake, Northwest Nelson, New Zealand
This report summarises work completed during 1988 in the Boulder Lake Licence. It includes a detailed evaluation of the Parsons Creek sulphide lense, infill extensions to the...Permit31881Start Date01 January 1988FormatsPDF TIFData TypeReport -
MR1030
Final report on EL33272 (Baton River) and EL33274 (Owen River) Northwest Nelson, New Zealand
Past mining & exploration reported. Initial reconnaissance indicated 5 anomalous areas. Small high grade Au deposits defined at Owen and Wangapeka goldfields, soil anomaly...Permit332721 +Start Date01 January 1988FormatsPDF TIFData TypeReport -
MR1005
Report on final work carried out on Parapara PL 311132
This report summarises the prospecting history of the Parapara prospecting licence to February, 1986. Drilling at Laverton Creek appears to have precluded the possibility of...Permit311132Start Date01 January 1986FormatsPDF TIFData TypeReport -
MR1000
Final report of work and expenditure PL 311290 for the period 23/2/84 to 22/2/86, Parapara Inlet
This report outlines work completed and expenditure on the licence from 1984 to 1986. Work included hand auger, surface mapping and trenching. Further work is required and the...Permit311290Start Date01 January 1984FormatsPDF TIFData TypeReport -
MR100
Puhipuhi Prospect - Progress report to September 30, 1982
Mapping and sampling revealed evidence of extensive recent hydrothermal activity and alteration, along with a number of Hg occurrences. 9 areas with potential for epithermal...Permit331141 +Start Date01 January 1982FormatsPDF TIFData TypeReport -
CR307
Eastern Southland lignite Project - Final Report
The reduction of a large area of the Eastern Southland Lignite Field to a series of priority-based targets was achieved via the drilling of a number of widely spaced exploratory...PermitUNASSIGNEDStart Date01 January 1979FormatsPDF TIFData TypeReport -
CR2542
Final report, Benhar deposit. Resource definition, geotechnical, hydrology and mine planning studies
The study addresses lignite resources within the Benhar Sector, 80km southwest of Dunedin and 8km inland from the coast. The study comprises part of LFTBs Phase II South Island...PermitUNASSIGNEDStart Date01 January 1985FormatsPDF TIFData TypeReport -
CR2541
Geology and coal resources of the Hikurangi coalfield, CPL 35-0308, final report
Hikurangi Coalfield worked by underground methods from 1890-1947 and by small opencasts to 1970s. Total extraction was approximately 4.15 million tonnes. Previous exploration...Permit35308Start Date01 January 1989FormatsPDF TIFData TypeReport